During the repair access to the necessary in the work official moduli of osushchestvl of yaetsya through interface ATA of pos by redstvom of dialogue P -.operations. In the official zone so are contained the ravine of the plant testing of accumulator, interface inaccessible through Ata-. But since the work of accumulator it does not influence, then the developers of user microprogram did not attend to by the possibility of its reading che cut Ata- interface. So it should be noted that a change (record) in the part of the moduli blocks ruyet accumulator itself, to avoid their spoiling. T k. the microprogram of accumulator Seagate Ux supplied from the plant is designed only for the work of disk in the user regime, then in it are not provided the methods of restoring the accumulator through Ata- interface with the spoiling of some overlay moduli. We imperatively recommend not to copy moduli Seagate Ux by the moduli of another accumulator of these models without the emergency! Each disk modulus is stored in the official region of disk in several cut rvnykh copies –from 2 to 12 copies, depending on the criticality of the loss of this modulus.
For the part of the moduli is provided the presence in title of signature (for example, SYS1, SYS2, OVAT) and check sum of modulus. Accumulator, checks these parameters during an attempt at the record of modulus and with their tactlessness simply he will not write down modulus; however, it can not report error. Therefore: 7) in the utility is provided the automatic conversion of the check sum (for those moduli, by which this it is necessary) during an attempt at their record; 8) after the record of modulus should be it considered conversely, in order to verify was accepted accumulator your changes.
Work with the moduli of the accumulator For the access to the moduli of official region to vybe to rite the point of menu Service - > CP Operations. The dialogue of work with the configurative pages is in detail described in the general management on complex HRT. One should especially accurately relate to the moduli with signature SYS1 and SYS2, since these moduli contain the most important adaptive tuning of accumulator, introduced there during the plant testing . With their loss the accumulator can ispor of tit's 4 forever! Work defect - by sheet the general information Dialogue defect - sheet has the following points: P+.g-.list – reflects the mixed defect - the sheet (P -.list, G -.list and Track-.list odnov belt) P -.list – plant (sectorial) defect - sheet. G -.list – the sheet of the acquired defects. The defects, discovered in the process of operating the accumulator, are placed in it. Track – track defect - sheet. Logical – window for adding the defects in the logical coordinates. You can either introduce the defects through this dialogue or import them from the file, sfor mi rovannogo by any program of testing logical surface. Then it is necessary to cause by the right knob of the mouse of menu defect - sheet and to harvest point "Upload". Defects will fall in P -.list.
上一篇:硬盘维修工具-HRT 下一篇:HRT的Seagate Drives U8, V8, U10英文说明书 |